Ndays Parameter to Piecewise Yield Curve

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

Ndays Parameter to Piecewise Yield Curve

ElMariachi
I am building a Swap Curve and am having trouble with setting the settle days to 2. I have included a sample spreadsheet TRY_QL.xls. I have also had trouble using the TRY (Turkish Lira) currency in Excel. What is going on with the settle_days = 2?